During the tight time period of the half term break Ellis Construction Services excavated the whole area, constructed a dwarf retaining wall and installed a drainage channel against the building before finishing the new surface in tarmac.
read more
Project completed for St Peters Roman Catholic School in Bromsgrove. Ellis Construction Services were able to design and re-profile the new footpath to overcome the tree root damage and remove the need for a separate ramp into the building.
read more
After many years of alterations and self building to their bungalow, our client wanted his driveway completing to the same standards as the rest of their property.
Click here to read more about this domestic driveway project completed by ECS of Bromsgrove
Supply and laying 100mm ducting and cabling to new traffic sign and lamp column installations, often in sites already congested with utility underground equipment.
Click here for more information
Ellis Construction Services Ltd was chosen by Catshill Middle School to extend their existing playground and remove the worn and damaged fencing between the playground and the nature decking area. This project was successfully completed in just three days during normal term time.
read more
After an errant motorist had struck the retaining wall to Recreation Road car park, Steve Martin, Bromsgrove District Councils Transport and Engineering Officer turned to Ellis Construction Services to repair the damaged section.
read more